Reproduce the imaging conditions established in trials
Position cameras to see required details without obstructing operation or maintenance. Distance, lenses, angles and light interact; higher resolution alone does not solve reflections or vibration.
Confirm mountings, cable paths, power, networks and site work requirements. Special areas or hazards require appropriate equipment and authorized methods, not ordinary cameras merely because they can read an image.
Associate installed views with actual point identities, units and ranges. Changes from trial geometry need revalidation. Successful readings during installation do not establish coverage of every shift or machine condition.
Scroll the diagram horizontally to inspect all details.
Accept imaging and recovery together
Test known answers and unreadable cases through to the receiving screen and storage with correct units and times. Seeing a camera stream verifies only the beginning of the data path.
Within authorized scope, test restart, camera loss and network disruption. Check duplicates and stale presentation, recording placement and versioned settings for future revalidation.
Installation schedules, warranties and equipment lists need confirmation for the site with an SI partner. These explanations describe preparation and inspection, not universal time or compliance guarantees.